Duffy Crane & Hauling supports Northwest Pipe for a massive pipe for the Denver water systems by providing the following services:

  • Crane support for assembly of the pipe pieces
  • PE designed and stamped lifting/rigging eyes
  • Steel detail drawings for providing the lifting/rigging eyes
  • Custom fabrication and assembly welding for lifting/rigging eyes per PE design drawings
  • Independent & certified weld inspection
  • Critical Two-Crane lift to “flip over” the pipe assembly for access to other half to complete assembly
  • Super-Load transportation of assembly (24’ wide, 32’ long, 12’ tall, 70,000 lbs.)
  • PE designed and stamped lift plans
  • Crane support to hoist & set pipe assembly into place at Marston Dam

Click on any of the images below to enlarge

Duffy Crane & Hauling NW Pipe Pick and FlipDuffy Crane & Hauling NW Pipe Pick and FlipDuffy Crane & Hauling NW Pipe Pick and FlipDuffy Crane & Hauling NW Pipe Pick and FlipDuffy Crane & Hauling NW Pipe Pick and FlipDuffy Crane & Hauling NW Pipe Pick and FlipDuffy Crane & Hauling NW Pipe Pick and FlipDuffy Crane & Hauling NW Pipe Pick and FlipDuffy Crane & Hauling NW Pipe Pick and FlipDuffy Crane & Hauling NW Pipe Pick and Flip

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 